Town Projects

Current Town Projects

Project
Status as of Jan. 3, 2023
Collins Road, U.S. 80 to Tripp Road

Roadway and light pole construction is complete. The Town is working with Oncor on getting power to the poles. The Town is also investigating possible upcoming landscape improvements in the medians of the roadway.
Collins Road, Tripp Road to Town East Boulevard

The Town has completed an updated traffic study on this project and is working on finalizing the number of lanes for this project. The Town is hoping to have preliminary drawings complete later this year, at which time we will schedule a meeting for the public to view the plans and ask questions.
Collins Road (SH 352), U.S. 80 to Mesquite City Limits

This TxDOT project is complete. The Town is working with the same consultant as on the Collins Road section, north of 80, regarding potential landscaping improvements along this section of roadway.
Barnes Bridge Road crossing over Duck Creek


The bridge remains closed to traffic and recent rain events have undermined the bridge further. The Town entered into an agreement with TxDOT for them to do all design and replacement work for the bridge. TxDOT will also pay for 90% of the project cost. The bridge replacement is on TxDOT's schedule and is anticipated to be complete in 2025.
Harris Addition Sewer and Alley Replacement,
Phase 2

Design work is ongoing for this project and is nearly complete. The Town hopes to start the bidding process for this work in the first half of 2023. This project will also include drainage improvements along Tripp and Jobson Roads.
Tripp Road drainage improvements, east of Collins Road

Design on this project is substantially complete. The Town is continuing the process of acquisition of required right-of-way and easements. After this is complete, the project will be sent out for bids.
2022 asphalt road repairs (various locations)

Map (PDF)

Work is underway to do repair/replacement of pavement on multiple roadways within the Town, including Collins Road, Town East Boulevard, Long Creek Road, and others. This work should be completed this fall. Staff is evaluating options for repairs of further sections of roadway in 2023.